How Long Is a Quote Valid? The Expiry Date That Protects Your Price

In short A quote is valid until the date you put on it. With no date, the client reads your price as an open-ended promise and comes back with it five months later, after copper and panels have moved. Trade practice in service work settles into three brackets: 7–14 days on repairs and service calls, 14–30 on remodels and installs, 30–60 on large projects. One line, "Valid through September 30", protects your price and hands you a reason to call before that day arrives.

You sent the solar quote in the middle of June. No reply, the thread went cold, you stopped thinking about it. The phone rings in September: "I'm ready to go on that quote, when can you start?" You open the file and start recalculating. Inverters are up, your crew is on new rates, and the September start you promised back then is booked out to November. The client is holding a piece of paper with your price on it and asking why today is different. The whole conversation comes down to one sentence that quote never had.

How long is a quote valid if you never put a date on it?

With no date on the document, a quote has no end, and the client assumes your price holds until they get around to answering. Rules on how long an offer binds exist, and without a written date their reading is contestable. One line settles it, and it does the same work on a $900 repair and a $90,000 install.

Without that line, three things happen at once. The client comes back months later and treats your document as a price list. You have to reprice the job and open the conversation with a correction, which always reads worse than a date announced up front. And the negotiation starts from your old number, so any move upward sounds like an increase you invented on the spot.

Trades use quote, estimate and bid to mean slightly different things, and most clients never notice the difference. Whichever word sits at the top of your document, the date underneath the total is what keeps the September phone call short.

There's a cost the client never sees. A quote with no end date stays open in your head too. You don't know whether the job is live or dead, so you keep slack in the calendar for work that may never arrive. Over a season that's a dozen phantom holds.

How many days should a quote be valid for?

Trade practice in service work settles into three brackets: 7–14 days on repairs and service calls, 14–30 days on remodels, installs and fit-outs, 30–60 days on large projects. The faster your material prices move and the faster your calendar fills, the shorter the sensible window. These brackets are habits the trades converged on.

Job typeValid forWhy that long
Repair, service call, small job7–14 daysThe decision gets made on the spot. A longer window lets the client drift and blocks an open slot on your calendar.
Remodel, install, fit-out14–30 daysThe client is collecting two or three bids and talking it over at home. Under two weeks starts to feel rushed.
Large project, new build, work with subs30–60 daysThere's financing, a permit or an HOA sign-off in the way. A short window would force you to reissue the quote every couple of weeks.

Move inside the brackets with two levers. Shorten when the quote carries a lot of material that swings on the commodity market (copper, lumber, steel, panels, aggregate), or when the start date is itself the product because your calendar is booked months out. Stretch when the client is waiting on a lender, a permit office or an HOA board and tells you up front how long that usually takes.

One more thing worth checking: the supplier and sub pricing your quote is built on has its own expiry. If your distributor holds panel pricing for 21 days and you write a 45-day quote, you carry the difference for 24 of those days. The simplest rule is to keep your window shorter than the shortest price hold you were given.

What does an expiry date do besides protect your price?

It does three jobs: it turns "I'll get back to you" into a decision with a deadline, it gives you a natural reason to call a few days before that deadline, and it clears phantom work out of your calendar. Across 20 open quotes, that's the difference between a list of tasks and a list of unanswered questions.

How do you word the expiry date so it doesn't sound like a threat?

One sentence in a visible spot on the quote, written the way you'd say it standing in someone's kitchen. The three versions below run under 20 words each and none of them uses a legal phrase. Always give a calendar date. The client can see it immediately, and "14 days from today" goes wrong for somebody every time.

  1. "This price holds through September 30. After that I'm happy to reprice it against current material costs."
  2. "The quote is good until Friday, September 12, because that's how long I'm holding the slot for you."
  3. "This number is good through October 15. If the decision needs longer, let me know and I'll refresh it."

Put that sentence directly under the total. In a footer next to your license number and payment details, nobody reads it. If you're emailing the quote, repeat the date in the body of the message, because half of clients read the email and only open the attachment on the day they decide.

What to leave out: language about automatic expiry, warnings in capitals, references to statutes. A quote from a tradesperson should read like a conversation. A date with a short reason behind it ("that's how long I'm holding the slot", "that's how long my supplier holds the panel price") goes down without friction. A dry expiry clause can earn you an annoyed phone call.

What do you do when a client comes back after the date?

Start by checking what actually moved since the day you sent it: material prices, crew rates, open dates. Three situations come out of that, and in all three the worst move is quietly waving through the old number. A client who resurfaces 2 or 3 months later usually signs anyway, as long as they hear a reason.

The price hasn't moved

The easiest version, and the one with the most upside sitting in it. Confirm the number out loud and let the client hear that you checked: "I ran it again, materials are holding, so the June price stands. I'll block the dates as soon as we sort the deposit." The client learns you kept an eye on the job, and you close the file that same day.

The price has gone up

Fold the update into the job itself. Reprice the lines against today's costs, show which ones actually moved, and give the new number together with a new expiry date. Illustrative example: an installer sends a $34,000 quote in June, the client calls back in September, the equipment lines (panels and inverter) are up 8%, which adds $2,100, so the new number is $36,100. A conversation with line items and a percentage in it ends in a signature far more often than a message announcing that prices went up.

If the gap is small and this is the client's second time round in one season, you can absorb it and say so out loud. A concession the client knows about does work for you. A silent one is money gone.

The slot is gone

Price is often the smaller problem here. Give the earliest honest start and offer a place in the queue: "September is full, I can be on site from October 20. If someone reschedules, you're the first call I make." Write that down with a date against it, because a promise like that is worth exactly as much as keeping it.

There's a fourth version of this story: the client never comes back at all, before the date or after it. The reasons behind that silence, and the call that breaks it, are unpacked separately in the piece on what to do when a client stops responding to a quote.

How do you keep track of expiry dates across 20 open quotes?

At five open quotes your memory covers it. At 20 you need a list that shows what's past its date without being asked. The minimum is a "Valid until" column in a spreadsheet and the habit of sorting by it every Monday morning. Sorting takes seconds; the spreadsheet only speaks when you open it.

The minimum set that works whatever tool you use:

A tool does one thing here that a spreadsheet can't: it surfaces the expired quotes without being asked. In Zapyo the date lives in a "Valid until" field on the quote, and the "needs attention" list puts a quote that's past that date at the very top, ahead of the ones with no follow-up and the ones that have simply gone quiet.

This leak is easy to miss, because nothing hurts on the day it happens. What it adds up to over a year is the subject of a separate piece on why the job you lost never said no.

Frequently asked questions

Is the validity date the same as the start date?

Two different dates, and both belong on the quote. Validity says how long the price holds. The start date says when your crew shows up. A client who sees only one of them fills in the other themselves, usually in their own favour. The cleanest version is two lines under the total: "Price valid through September 30" and "Start on site: from October 14".

Can you extend a quote's validity?

Yes, and it's the simplest move in the whole business. A short message does it: "I'm extending the quote to October 20, price unchanged." You also get a second contact without inventing a pretext for it. If material costs have moved in the meantime, send a repriced quote with a fresh date and one line on what changed.

The client accepted inside the window. What about the deposit?

Deposit terms are a separate agreement from the validity date, and mixing them into one sentence only stretches the conversation. Once the client accepts, confirm three things in writing: scope, price and start date. Payment terms go in as a fourth point, on whatever basis you normally work.

Won't a short validity window scare clients off?

A window with no reason behind it does. "Offer valid 7 days" reads as pressure; "price good through Friday, that's how long my supplier holds the panel price" reads as information. Homeowners take short windows calmly once they know why. On commercial work, give more time, because the decision passes through several people.

In Zapyo every quote has a "Valid until" field, and the "needs attention" list puts quotes past that date first.